0 0 By avciarchitects In AVCI ARCHITECTS, ResidentialPosted August 25, 2014The Balance Gunesli Construction ProgressingWhile project’s rough construction works are continuing, at the C, F, B and E blocks all the 4 basement levels have been completed. Therefore, the street level which is designed between the [...] READ MORE