The construction of the towers at Balance Güneşli site has reached the 14th level. Sloping blocks B and E’s reinforced concrete works have been completed and facade installation has [...]
While project’s rough construction works are continuing, at the C, F, B and E blocks all the 4 basement levels have been completed. Therefore, the street level which is designed between the [...]